Aero 
   Dynamics
Home  Processes  Services  Quotes  Customer Approvals  About Us  Contact Us  

Stormwater Pollution Prevention Plan


This Stormwater Pollution Prevention Plan (SWPPP) has been prepared for the Aero Dynamics, Inc. facility located at 142 Batchelder Road in Seabrook, New Hampshire (the Facility), in accordance with the Environmental Protection Agency's (EPA) National Pollutant Discharge Elimination System (NPDES) Multi-Sector General Permit (MSGP) for Stormwater Discharges Associated with Industrial Sources. The industrial activities at the Facility consist of electroplating and metal finishing for various aerospace, military, and commercial applications. The facility Standard Industrial Classification (SIC) Code is 3471 - Electroplating, Plating, Polishing, Anodizing, and Coloring, which is included in Sector AA1-Fabricated Metal Products, except Coating of the MSGP. An electronic Notice of Intent (NOI) that was submitted to the EPA is included in Appendix A.

This SWPPP has been prepared in accordance with good engineering practices and provides the preventative measures, monitoring and reporting procedures, and records that are required to maintain compliance with the conditions of the MSGP for Sector AA1. It identifies potential sources of pollution that may be expected to affect the quality of stormwater associated with industrial activity that discharges to outfalls covered by the MSGP. This SWPPP also describes Best Management Practices (BMPs) that have been implemented to minimize pollutants in the stormwater discharged from the Facility. The purpose of the SWPPP is to document the management practices and stormwater pollution prevention measures that are in place or will be implemented at the Facility to minimize or eliminate impacts of stormwater discharges by potential pollutants at the site. As required by the MSGP, the SWPPP contains the following components:
1. Stormwater pollution prevention team;
2. Site description;
3. Summary of potential pollutant sources;
4. Description of control measures;
5. Schedules and procedures;
6. Documentation to support eligibility considerations under other federal laws; and
7. Certification of this SWPPP by facility management.

Select this link to download and view the full Stormwater Pollution Prevention Plan.

Please Note: The the full detailed report is a a PDF file with 465 pages and may take a long time to download and view. In order to see the report you need to have pdf viewer installed on the system.